Godalming, Surrey · Mon–Fri 07:30–17:30 01483 528 771
Service — EV chargers

Home charging, wired by the family’s EV specialist.

Jack leads our EV work — he qualified in 2023 and has installed chargers across most of Surrey since. We’ll size the circuit properly, handle the DNO paperwork, and tell you straight if the charger you’ve seen online is the wrong one for your house.

Install from £520 · with a 7kW charger supplied by us from £1,070, inc. VAT

A matte-black EV charging unit on the brick wall of an English house at dusk

What’s included

  • A dedicated 7kW charging circuit from your consumer unit
  • Type A RCBO or O-PEN protection device as your installation requires
  • DNO notification handled for you — it’s a legal requirement, and it’s included
  • Load check on your existing supply so the shower and the car can run at once
  • Charger commissioned, app connected, and a proper handover
  • EIC covering the new circuit

Certification issued: Electrical Installation Certificate (EIC) + DNO notification


How it goes

  1. 01

    Photos and a price

    A photo of your fusebox and of where the car parks is usually all Jack needs to price the job.

    Price within 1 working day

  2. 02

    Charger choice

    Bring your own or take our recommendation. We fit most makes and we’ll say plainly which ones we won’t.

  3. 03

    Installation

    Cable run, charger mounted, circuit protected and tested. Most installs are done well inside a day.

    3–6 hours on site

  4. 04

    Commissioning and handover

    We connect the app, set your off-peak schedule, and leave you charging. DNO notification follows within days.

    Certificate within 48 hours

What moves the price

Factor Why it matters
Cable run distance Under 5m from fusebox to parking is the base price; 5–15m adds £120, over 15m adds £280.
Wall and route Brick and render are straightforward. Routing through a garage adds about £90 in time and materials.
Charger supplied by us Around £550 for a solid 7kW unit with a proper warranty. You’re welcome to supply your own.
Your existing supply Older fuseboxes sometimes need work before a charger can go on safely — we check first, not after.

Questions we actually get asked

Can I get a grant?

Most homeowners with off-street parking no longer qualify — current schemes mainly cover flats, rented properties and landlords. We’ll tell you if you qualify for any current grant rather than promising discounts that don’t exist.

Do I need three-phase power?

Almost certainly not. A 7kW charger on a normal single-phase supply adds about 25–30 miles of range per hour, which covers the way most people actually drive.

Can it charge from my solar panels?

Yes — several chargers we fit have a solar-matching mode that charges from excess generation. Tell Jack you have panels and he’ll spec around them.

What’s the DNO notification about?

Your District Network Operator must be told when a charger is connected — it affects local grid planning. It’s our job, not yours, and it’s included in the price.

My fusebox looks ancient. Is that a problem?

Sometimes. A charger needs a sound board to connect to, and some older ones need upgrading first. Send the photo — Jack will tell you honestly before anything is booked.

Tell us what needs doing.

Use the instant estimate tool for a realistic price range in two minutes, or call the office and speak to Dawn.

Call Dawn Instant estimate